Sunday, 1 September 2013

still bridge building ....

Still working on the bridge; had some difficulty trying to find the best way to represent the lifting ropes and winding gear - eventually settled for florists wire for the ropes and the winding gear using a ships wheel (the rope is wound on drums inside the bridge pier)- shown here in raised position with some 28mm figs..

2 comments:

Douglas said...

Has the officer of Engineers got the plan the right way up?

Springinsfeld said...

Ingenious.