Saturday, 17 October 2026

The palace rebuild starts....

The plan is to have the main front section approx the same size & width as the rear and side elevations; palace low relief sections will be based on some hardboard recovered from some bookcases that have been dismantled.

New look main entrance section ....
Trial dry-run assembly of sections
The wing to the ballroom/view platform will be a separate piece ( to reduce storage width needs)